LIST OF COMPLETED SLOPE PROJECTS
NO. | PROJECT TITLE | CLIENT | NAME OF | CONTRACT (RM) | CONTRACT PERIOD | COMPLETION | |
---|---|---|---|---|---|---|---|
RESPONSIBLE ENGINEER | SITE POSSESSION | COMPLETION | DATE | ||||
ACTUAL | |||||||
1 | Meningkatkan Taraf Cerun di Bukit Gedung & Bukit | Penang | Mr. Khor Yee Hsiang | 381760 | 1997-06-06 00:00:00 | 1998-02-21 00:00:00 | 1998-01-24 00:00:00 |
Jambul, P.Pinang (Design & Build) | Development | Engineer | |||||
2 | Meningkatkan Taraf Cerun di Bkt Bendera (KM146) | JKR Pulau Pinang | Tn. Hj. Samsuddin Bakar | 103000 | 1998-09-01 00:00:00 | 1998-09-30 00:00:00 | 1998-09-30 00:00:00 |
P.Pinang (Design & Build) | District Engineer | ||||||
3 | Membaikpulih Struktur Penahan Hakisan Ombak, | JKR | Tn. Hj. Samsuddin Bakar | 114750 | 1998-12-22 00:00:00 | 1999-05-10 00:00:00 | 1999-01-15 00:00:00 |
dan Kerja-kerja Berkaitan di Bangunan Lembaga Buruh | Pulau Pinang | District Engineer | |||||
Pelabuhan Pulau Pinang (Design & Build) | |||||||
4 | Meningkatkan Taraf Cerun di Bkt Bendera | JKR | Tn. Hj. Samsuddin Bakar | 76742 | 1999-01-01 00:00:00 | 1999-02-01 00:00:00 | 1999-02-01 00:00:00 |
( Richmond Bungalow) P.Pinang (Design & Build) | Pulau Pinang | District Engineer | |||||
5 | Meningkatkan taraf Cerun di Bukit Bendera | JKR | Tn. Hj. Samsuddin Bakar | 180848 | 1999-02-01 00:00:00 | 1999-03-15 00:00:00 | 1999-03-15 00:00:00 |
( Top Station ) Pulau Pinang (Design & Build) | Pulau Pinang | District Engineer | |||||
6 | Menstabil Tebing Batu di Bkt Saujana, Paya Terubong, | JKR | Tn. Hj. Samsuddin Bakar | 165000 | 1999-09-01 00:00:00 | 1999-09-30 00:00:00 | 1999-09-30 00:00:00 |
Pulau Pinang (Design & Build) | Pulau Pinang | District Engineer | |||||
7 | Menstabil & Memperkukuhkan Kaw Tebing Runtuh | JKR | Tn.Hj. Samsuddin Bakar | 405000 | 2000-02-09 00:00:00 | 2000-04-09 00:00:00 | 2000-04-09 00:00:00 |
di KM 19.8 Jln Tun Sardon, P.Pinang (Design & Build) | Pulau Pinang | District Engineer | |||||
8 | Cadangan Pemasangan 'Rock Netting' dan Kerja-kerja | JKR | Tn. Hj. Samsuddin Bakar | 1600000 | 2000-10-16 00:00:00 | 2001-01-15 00:00:00 | 2001-01-15 00:00:00 |
Berkaitan Menstabil Tebing Batu di Bukit Saujana Paya | Pulau Pinang | District Engineer | |||||
Terubong, Pulau Pinang (Design & Build) | |||||||
9 | Cadangan Pembaikan Cerun di Lot 9.8 Jeep Track, | JKR | Tn.Ir Zabidi Hamid | 348406 | 2000-11-28 00:00:00 | 2001-01-27 00:00:00 | 2001-01-27 00:00:00 |
Penang Hill (Design & Build) | Pulau Pinang | District Engineer | |||||
10 | Design Construction & Completion of Remedial Works | JKR | Tn.Ir Zabidi Hamid | 469037 | 2001-04-02 00:00:00 | 2001-07-22 00:00:00 | 2001-05-22 00:00:00 |
on Slope at SM Bkt Jambul,Penang (Design & Build) | Pulau Pinang | District Engineer | |||||
11 | Kerja-kerja Pembaikan Cerun di Bkt Berhampiran Apmt | JKR | Tn. Ir Zabidi Hamid | 2240000 | 2001-05-08 00:00:00 | 2001-11-08 00:00:00 | 2001-10-04 00:00:00 |
Sun Moon City, Paya Terubong, Penang | Pulau Pinang | District Engineer | |||||
(Design & Build) | |||||||
12 | Slope Stabilisation & Mitigation Works at Desa | I & P | En. Mohd Hisham Kasim | 657000 | 2002-02-05 00:00:00 | 2002-05-05 00:00:00 | 2002-04-22 00:00:00 |
Mutiara II, Phase 5A Jln Yeap Chor Ee, Penang | Setiawangsa | Senior Project Engineer | |||||
(Design & Build) | |||||||
13 | Kerja-kerja Merekabentuk Dan Membaikpulih Cerun | Lembaga Air Perak | En. Ishak Abd Rahman | 805418.3 | 2002-12-09 00:00:00 | 2003-03-09 00:00:00 | 2003-03-09 00:00:00 |
Runtuh Di Tangki Air Ulu Kenderong, Gerik, | Engineer | ||||||
Perak Darul Ridzuan. (Design & Build) | |||||||
14 | Kerja-kerja Membaikpulih Tebing Runtuh Dan | JKR | Tn. Ir. Mohd Jabil Bakri | 2850000 | 2002-12-04 00:00:00 | 2003-05-04 00:00:00 | 2003-05-04 00:00:00 |
Kerosakan Jalan Di Genting Peras (B32) Dalam Daerah | Selangor | District Engineer | |||||
Hulu Langat, Selangor Darul Ehsan (Design & Build) | |||||||
15 | Menaiktaraf Jalan Paya Terubong dari Jalan Air Itam / | JKR | En. Adena Mamat | 3732500 | 2003-06-05 00:00:00 | 2003-10-29 00:00:00 | 2003-10-29 00:00:00 |
Bandar Baru Air Itam ke Jalan Paya Terubong / Jalan | Pulau Pinang | District Engineer | |||||
Relau, Pulau Pinang - Kerja-kerja Penstabilan Cerun | |||||||
Majestic Height, Pulau Pinang (Design & Build) | |||||||
16 | Kerja-kerja Membaiki Cerun Runtuh di Beberapa Lokasi | JKR | En. Mohd Zein Mohd Nor | 3100000 | 2003-11-10 00:00:00 | 2004-02-09 00:00:00 | 2004-01-29 00:00:00 |
Di Antara Seksyen 15.0 Hingga Seksyen 30.0 Laluan | Selangor | District Engineer | |||||
Persekutuan 55, Jalan KKB - Gap, Daerah Hulu Selangor | |||||||
Selangor Darul Ehsan (Design & Build) | |||||||
17 | Stablisation of Rock Slope & Earth Slope at Desa | I & P | En. Mohd Hisham Kasim | 332930.2 | 2004-02-01 00:00:00 | 2004-05-02 00:00:00 | 2004-03-12 00:00:00 |
Mutiara II - Phase 7, Jln Yeap Chor Ee, Penang | Setiawangsa | Senior Project Engineer | |||||
(Design & Build) | |||||||
18 | Proposed Rectification and Completion of A 2.9 Mil. | Perbadanan Bekalan | Tn. Ir. Jaseni Maidinsa | 124900 | 2004-03-02 00:00:00 | 2004-05-10 00:00:00 | 2004-05-05 00:00:00 |
Gal. R.C Reservoir and Associated Works at Genting, | Air Pulau Pinang | Development Manager | |||||
Balik Pulau, Penang (Proposed Slope Stabilisation) | Sdn Bhd | ||||||
(Design & Build) | |||||||
19 | Kerja-kerja Kecemasan Untuk Pembaikan Cerun di | Jabatan Perhutanan | En. Zulkifli Ahmad | 420000 | 2004-08-26 00:00:00 | 2004-11-25 00:00:00 | 2004-09-30 00:00:00 |
Kawasan Ibu Pejabat Perhutanan Semenanjung | Semenanjung | Pengarah Industri Hutan | |||||
Malaysia, Jln Sultan Salahuddin, 50660 K.Lumpur | Malaysia | ||||||
(Design & Build) | |||||||
20 | Kajang Traffic Dispersal Ring Road (Package 3 - | Sunway Construction | Mr. Liew Kok Wing | 761736 | 2004-09-24 00:00:00 | 2004-11-07 00:00:00 | 2004-11-07 00:00:00 |
Section 2C) Rock Stabilisation & Protection Work, | Sr. Project Manager | ||||||
Selangor (Design & Build) | |||||||
21 | Kerja Menyiasat, Merekabentuk, Membina & | JKR | En Ilhami Mohd Idrus | 1831665.2 | 2004-11-05 00:00:00 | 2005-02-03 00:00:00 | 2005-02-03 00:00:00 |
Menyiapkan Pembaikan Cerun Runtuh Di Sebelah | Selangor | K.P.P. Bangunan | |||||
Bangunan Annex, Dewan Undangan Negeri Selangor | |||||||
(Design & Build) | |||||||
22 | Proposed Slope Remedial Work At Ch 67+500, | PPES Works | En. Norazman Abd. Latip | 690000 | 2004-12-13 00:00:00 | 2005-01-18 00:00:00 | 2005-01-18 00:00:00 |
(Federal Road Code: 1 - 7), Sg. Topah - Bau/Tondong | Sdn. Bhd. | Project Manager | |||||
Junction, Sarawak (Design & Build) | |||||||
23 | Proposed Rectification and Completion of A 2.9 Mil. | Perbadanan Bekalan | Tn. Ir. Jaseni Maidinsa | 199960 | 2005-01-15 00:00:00 | 2005-03-14 00:00:00 | 2005-02-14 00:00:00 |
Gal. R.C Reservoir and Associated Works at Genting, | Air Pulau Pinang | Development Manager | |||||
Balik Pulau, Penang (Proposed Slope Stabilisation) | Sdn Bhd | ||||||
(Design & Build) | |||||||
24 | Proposed Slope Remedial Works at PBA Water | Perbadanan Bekalan | Tn. Ir. Jaseni Maidinsa | 199716.2 | 2005-04-01 00:00:00 | 2005-05-31 00:00:00 | 2005-04-22 00:00:00 |
Treatment Plant, Batu Feringghi, Pulau Pinang | Air P.Pinang Sdn Bhd | Development Manager | |||||
(Design & Build) | |||||||
25 | Membina 'Rockfall Fence' dan kerja-kerja Berkaitan | Majlis Perbandaran | Tn Ir Mohd Mokhtar Mohd Murad | 130486.8 | 2005-06-13 00:00:00 | 2005-07-17 00:00:00 | 2005-07-04 00:00:00 |
di Kawasan Lereng Bukit, Taman Perbandaran, | Pulau Pinang | ||||||
Persiaran Kuari, P.Pinang (Design & Build) | Engineer | ||||||
26 | Kerja-kerja Pengukuhan dan Penstabilan Cerun bagi | Penang Development | Nor Azman Abu Bakar | 431609 | 2005-08-10 00:00:00 | 2005-10-10 00:00:00 | 2005-09-05 00:00:00 |
Kerja Cadangan Jalan dan Parit untuk Jeti Batu Musang, | Corporation / | Managing Director | |||||
Batu Musang, Batu Kawan, Seberang Perai Selatan | Puncak Mekar Bina | ||||||
(Design & Build) | |||||||
27 | Memperbaiki Cerun di Jalan Baling ke Pengkalan Hulu | JKR | Hj Abd Halim H. Raman | 200000 | 2005-11-08 00:00:00 | 2006-01-05 00:00:00 | 2005-11-23 00:00:00 |
KM52, Daerah Baling, Kedah Darul Aman | Kedah | District Engineer | |||||
(Design & Build) | |||||||
28 | Proposed Slope Remedial Works Between KM 42 | JKR | Tn Hj Hanafiah B Mohd Sharif | 419144.8 | 2006-04-19 00:00:00 | 2006-08-15 00:00:00 | 2006-05-29 00:00:00 |
to KM 43, Jalan Muar - Labis, Muar, Johor Darul Takzim. | Johor | ||||||
(Design & Build) | Jurutera Jalan | ||||||
29 | Proposed Slope Remedial Works Along The Access | JKR Pahang | Tn Hj Rahim Goon | 610000 | 2006-04-19 00:00:00 | 2006-07-19 00:00:00 | 2006-06-02 00:00:00 |
Road To Kea Farm Off Jalan Brinchang, Cameron | KPP Jalan | ||||||
Highland, Pahang Darul Makmur (Design & Build) | |||||||
30 | Merekabentuk dan Membaik Pulih Cerun Tangki Air | Syarikat Air | Tn Hj Fakrurazi Ismail | 547703.4 | 2006-04-24 00:00:00 | 2006-07-23 00:00:00 | 2006-06-08 00:00:00 |
Dan Kerja-kerja Berkaitan di Bukit Gajah, Besut, | Terengganu | Pengurus Rekabentuk & | |||||
Terengganu. (Design & Build) | Pembangunan | ||||||
31 | Merekabentuk dan Membaikpulih Cerun Tangki Air | Syarikat Air | Tn. Hj. Fakrurazi Ismail | 688698.7 | 2006-08-01 00:00:00 | 2006-11-27 00:00:00 | 2006-09-10 00:00:00 |
dan Kerja-kerja Yang Berkaitan di Bukit Losong, | Terengganu | Pengurus Rekabentuk & | |||||
Kuala Terengganu, Terengganu. (Design & Build) | Pembangunan | ||||||
32 | Kerja-kerja Pembaikan Cerun di Jalan Baling ke | JKR | Hj.Abd Halim H. Raman | 121000 | 2006-08-10 00:00:00 | 2006-10-09 00:00:00 | 2006-09-07 00:00:00 |
Pengkalan Hulu (FT076) Bagi Daerah Baling, Kedah | Kedah | District Engineer | |||||
Darul Aman. (Design & Build) | |||||||
33 | Proposed Slope Remedial Works at Institut Keselamatan | JKR | En. Abu Bakar b. | 1409531.67 | 2006-08-21 00:00:00 | 2006-10-10 00:00:00 | 2006-10-10 00:00:00 |
dan Kesihatan Pekerjaan Negara (NIOSH), Johor Bahru | Johor | Abd. Aziz | |||||
Branch, Johor Bahru, Johor Darul Takzim | Penolong Pengarah Bangunan | ||||||
(Design & Build) | |||||||
34 | Remedial Works Along Eastern Bank of Sungai Buloh, | Johor Port Berhad | En Mohamed Abd. Wahab | 2539034 | 2006-10-07 00:00:00 | 2007-01-20 00:00:00 | 2007-01-20 00:00:00 |
Johor Port, Pasir Gudang, Johor Darul Takzim | Jurutera Jabatan | ||||||
(Design & Build) | Kejuruteraan Awam | ||||||
35 | Slope Rectification For Proposed Housing Development | Koperasi Polis Diraja | Ir. Wan Abdul Rahim | 600000 | 2006-12-11 00:00:00 | 2007-03-10 00:00:00 | 2007-02-15 00:00:00 |
At Lot 2699, Mukim Sik, Sik, Kedah Darul Aman | Pulau Pinang Berhad | bin Wan Sulaiman | |||||
(Design & Build) | Principal | ||||||
36 | Merekabentuk Dan Membaikpulih Cerun | Syarikat Air | Tn. Hj. Fakrurazi Ismail | ||||
Bunded Storage' dan Lain-Lain Kerja Yang Berkaitan di | Terengganu | Pengurus Rekabentuk & | 279057.4 | 2007-02-25 00:00:00 | 2007-05-05 00:00:00 | 2007-03-21 00:00:00 | |
Loji Air Bukit Bauk, Dungun, Terengganu | Pembangunan | ||||||
(Design & Build) | |||||||
37 | Kerja-Kerja Membaik Pulih Cerun Runtuh Dan | JKR Selangor | Prem Kumar A/L | ||||
Kerja-kerja Berkaitan Di KM 37.60 Laluan Persekutuan | Kaliappan | 600000 | 2007-02-07 00:00:00 | 2007-05-06 00:00:00 | 2007-04-05 00:00:00 | ||
FT068 Jalan Kuala Lumpur-Bentong, Gombak, | Pen. Pengarah Jalan | ||||||
Selangor Darul Ehsan. (Design & Build) | JKR Selangor | ||||||
38 | Kerja-Kerja Membaik Pulih Cerun Runtuh Di KM2.1, | JKR Selangor | Prem Kumar A/L | 4260000 | 2007-06-12 00:00:00 | 2007-10-11 00:00:00 | 2007-10-11 00:00:00 |
KM5.5 (2 Lokasi) Di Laluan Negeri B62, Jalan | Kaliappan | ||||||
Ampang Hulu Langat Dan di KM36.5,KM36.7 & | Pen. Pengarah Jalan | ||||||
KM38.9 (3 Lokasi) Di Laluan Negeri B32 Jalan | JKR Selangor | ||||||
Klawang-Bukit Peras, Di Dalam Daerah Hulu, | |||||||
Selangor Darul Ehsan. (Design & Build) | |||||||
39 | Cadangan Kerja-Kerja Merekabentuk Dan Membaik- | Tenaga Nasional | Ir. Zulkifli Mohd Yusof | 1647612 | 2007-09-11 00:00:00 | 2008-01-10 00:00:00 | 2007-11-27 00:00:00 |
pulih Cerun Di Sekitar Menara No 7A, 7B & 7C Talian | Berhad | Ketua Talian Hidup & | |||||
275KV, Segari-Air Tawar (Design & Build) | Kejuruteraan Awam, | ||||||
40 | Membaiki Tebing Yang Runtuh di Bukit Raja, Lenggong, | Pej Daerah & Tanah | Meor Syaharizan | 170800 | 2007-11-14 00:00:00 | 2007-12-07 00:00:00 | 2007-12-07 00:00:00 |
Perak Darul Ridzuan. (Design & Build) | Lenggong, Perak | Penolong Jurutera | |||||
41 | Slope Stabilisation Works at PLC/MS-Myanmar | Total E&P Myanmar | Martine Valex | 879639.3 | 2008-04-01 00:00:00 | 2008-06-30 00:00:00 | 2008-05-06 00:00:00 |
(Design & Build) | General Manager | ||||||
42 | Membina Benteng di Lereng Bukit Depan Rumah | Majlis Daerah | Ishak Md Napis | 165000 | 2008-05-16 00:00:00 | 2008-08-29 00:00:00 | 2008-06-10 00:00:00 |
No. 9-16, Taman Bukit Senyum, Lenggong, Perak | Lenggong | Yang DiPertua | |||||
(Design & Build) | |||||||
43 | Kerja-Kerja Membaikpulih Cerun Runtuh Dan Kerja- | JKR Selangor | Tn Hj Jalalonmuhali B. Abd Rahman | 1830000 | 2008-09-15 00:00:00 | 2008-12-15 00:00:00 | 2008-11-25 00:00:00 |
Kerja Berkaitan Di KM 33.30 dan KM 35.06, Laluan | |||||||
Persekutuan FT068, Jalan Kuala Lumpur-Bentong Lama, | Ketua Penolong Pengarah Jalan Negeri Selangor | ||||||
Daerah Gombak, Selangor Darul Ehsan | |||||||
(Design & Build) | |||||||
44 | Kerja-kerja Menbaikpulih Cerun Di Kawasan | Universiti Sains | Tn.Ir Hj Mohamad Sofian Ahmad | 931449.2 | 2008-09-20 00:00:00 | 2008-12-20 00:00:00 | 2008-12-18 00:00:00 |
Desasiswa Restu, Universiti Sains Malaysia, Penang | Malaysia, Penang | ||||||
(Design & Build) | Pengarah Jab. Pembangunan USM, Penang | ||||||
45 | Merekabentuk, Membina dan menyiapkan Kerja-kerja | JKR Pahang / | En Shuib Ahmad | 9280869.86 | 2008-05-27 00:00:00 | 2009-06-02 00:00:00 | 16-Mac-09 |
kecemasan (AP 55) akibat cerun runtuh di KM 4-5, | Bee Eye Engineering | Managing Director | |||||
Laluan FT 148, Jalan Baru naik ke Bukit Fraser, Raub, | |||||||
Pahang Darul Makmur (Design & Build) | |||||||
46 | Merekabentuk dan Membaikpulih Cerun Tangki Air | Syarikat Air | Tn. Hj. Fakrurazi Ismail | 1167625 | 2009-01-01 00:00:00 | 2009-04-01 00:00:00 | 2009-03-13 00:00:00 |
Dan Lain-lain Kerja Yang Berkaitan di Bukit Pepari, | Terengganu | Pengurus Rekabentuk & | |||||
Setiu, Terengganu (Design & Build) | Pembangunan | ||||||
47 | Provision of Materials, Machineries and Skilled | Total E&P Myanmar | Nicolas Terraz | 1883424 | 2009-01-13 00:00:00 | 2009-04-13 00:00:00 | 2009-03-27 00:00:00 |
Manpower for Slope Stabilization Works at PLC/MS, | General Manager | ||||||
Phase II (LSMS-1&4), Myanmar (Design & Build) | |||||||
48 | Penstabilan Cerun Rumah No. 25 Hingga 32, Taman | Perniagaan Masoha / | Md Kassim Hanafi | 226554 | 2009-06-08 00:00:00 | 2009-08-07 00:00:00 | 2009-07-06 00:00:00 |
Bukit Senyum, Lenggong, Perak. (Design & Build) | Maj Daerah Lenggong | Manager | |||||
49 | Kerja-Kerja Pengerudian Tanah di Salak Tinggi Untuk | Tenaga Nasional | Nur Irfah Bt Mohd Pauzi | 6806 | 2009-08-24 00:00:00 | 2009-09-01 00:00:00 | 2009-09-01 00:00:00 |
Kajian "Rock Mass Characterization", | Berhad | Pensyarah Kejuruteraan | |||||
Universiti Tenaga Nasional | |||||||
50 | Removing and Scaling of Loose and Fractured Rock | Perdana Parkcity | 16380 | 2009-10-14 00:00:00 | 2009-10-24 00:00:00 | 2009-10-15 00:00:00 | |
Works in Sector E (1st Stage) at Desa Parkcity, | Sdn Bhd | Site Engineer | |||||
Kuala Lumpur (Design & Build) | |||||||
51 | Cadangan Merekabentuk, Membina, Menyiapkan dan | Pembinaan I & R | Pn Maznah Binti Salamin | 1264338.3 | 2010-02-01 00:00:00 | 2010-09-12 00:00:00 | 2010-04-06 00:00:00 |
Menyelenggara Kerja-Kerja Penstabilan Cerun Dan | Sdn Bhd/ | Jurutera Awam | |||||
Kawalan Hakisan Serta Kerja-kerja Berkaitan Di | UiTM Segamat, Johor | UiTM Segamat, Johor | |||||
Universiti Teknologi Mara Malaysia (UiTM) Segamat, | |||||||
Johor (Design & Build) | |||||||
52 | Kerja-Kerja Penstabilan Cerun Di Dalam Kawasan Majlis | Perniagaan Masoha | Meor Syaharizan Meor Mohd Hariri | 209510.8 | 2010-04-08 00:00:00 | 2010-06-18 00:00:00 | 2010-05-07 00:00:00 |
Daerah Lenggong, Perak | Sdn Bhd/ | ||||||
(Design & Build) | Maj. Daerah | Penolong Jurutera | |||||
Lenggong | Majlis Daerah Lenggong | ||||||
53 | Slope Treatment Near Old Batching Plant Site At | Lembaga Air Perak | Hj Idris Bin Hj Ibrahim | 153480 | 2010-04-07 00:00:00 | 2010-06-08 00:00:00 | 2010-06-08 00:00:00 |
Empangan Sultan Azlan Shah, Ulu Kinta, Ipoh, Perak | Senior Engineer | ||||||
(Design & Build) | |||||||
54 | Slope Protection Works For Casa Damansara 3 For The | Tropicana City Sdn Bhd | Mr Yee Sin Min | 479968.4 | 2010-04-15 00:00:00 | 2010-07-29 00:00:00 | 2010-07-01 00:00:00 |
Execution And Constructions Of Superstructure Works | Timbalan Pengurus | ||||||
To Proposed Mixed Development (Tropicana City) At | Petaling Jaya, | Besar | |||||
Lot PT7, Jalan SS20/27, Petaling Jaya, Selangor | Selangor | ||||||
(Design & Build) | |||||||
55 | Kerja-Kerja Membaiki Cerun di K.M 1.5, Bukit Bendera, | JKR Timur Laut/ | Tn Hj Ibrahim Bin Ahmad | 179517.5 | 2010-07-19 00:00:00 | 2010-10-11 00:00:00 | 2010-08-21 00:00:00 |
Daerah Timur Laut, Pulau Pinang | Ramli Bin Husin | Engineer | |||||
(Design & Build) | |||||||
56 | Kerja-Kerja Kecemasan Bagi Penstabilan Cerun Di Loji | Lembaga Air Perak | Hj Ishak B. Abdul Rahman | 483000 | 2010-08-05 00:00:00 | 2010-11-05 00:00:00 | 2010-10-11 00:00:00 |
Pembersihan Air, Bukit Larut, Taiping, Perak | Senior Engineer | ||||||
(Design & Build) | |||||||
57 | Proposed Soil Nail With Grid Beam at CH 41800 - | MMC-GAMUDA JV | Maslan Othman | 495128.4 | 2010-08-01 00:00:00 | 2010-12-01 00:00:00 | 2010-11-16 00:00:00 |
CH 42025 for electrified doubled track project Gurun, | Project Manager | ||||||
Kedah (Design & Build) | |||||||
58 | Membaikpulih Dan Menstabil Cerun Runtuh Di Taman | Perniagaan Masoha | Meor Syaharizan Meor Mohd Hariri | 456240.7 | 2010-10-01 00:00:00 | 2010-11-29 00:00:00 | 2010-11-16 00:00:00 |
Lenggong Majlis Daerah Lenggong, Perak | Sdn Bhd / | ||||||
(Design & Build) | Maj. Daerah | Penolong Jurutera | |||||
Lenggong | Majlis Daerah Lenggong | ||||||
59 | Membaikpulih Dan Menstabilkan Cerun Runtuh Di Kg. | Sykt Agro Bina | Meor Syaharizan Meor Mohd Hariri | 430000 | 2010-10-01 00:00:00 | 2010-12-09 00:00:00 | 2010-12-09 00:00:00 |
Tersusun Bukit Raja, Majlis Daerah Lenggong, Perak | Maj. Daerah | ||||||
(Design & Build) | Lenggong | Penolong Jurutera | |||||
Majlis Daerah Lenggong | |||||||
60 | Proposed Development On Lots 27, 31 And 32, | Plenitude Sdn Bhd / | Mr Ir Cheah Siew Wai | 122911 | 2010-12-16 00:00:00 | 2011-02-09 00:00:00 | 2011-01-27 00:00:00 |
Seksyen 2, Bandar Batu Feringghi, Daerah Timur Laut, | G & P Geotechnics | Project Manager | |||||
Pulau Pinang - Award of Rock Slope Strengthening | Sdn Bhd | ||||||
Works (Design & Build) | |||||||
61 | Kerja-Kerja Kecemasan Membaikpulih Cerun Runtuh | Lembaga Air Perak | Hj Idris Bin Hj Ibrahim | 380000 | 2010-12-20 00:00:00 | 2011-02-18 00:00:00 | 2011-01-27 00:00:00 |
Dan Kerja Berkaitan Di Loji Taiping Headworks, | Senior Engineer | ||||||
Taiping Perak - Cerun 2 (Design & Build) | |||||||
62 | Gunite Slope & Soil Nail Works Di Atas Lot 27,31 Dan 32, | Plenitude Sdn Bhd / | Mr Ch'ng Beng Chye | 474619 | 2010-12-16 00:00:00 | 2011-03-02 00:00:00 | 2011-02-10 00:00:00 |
Seksyen 2, Bandar Batu Feringghi, Daerah Timur Laut, | Choongcons Sdn Bhd | Project Manager | |||||
P.Pinang (Design & Build) | |||||||
63 | Cadangan Kerja-Kerja Penstabilan Cerun Di Dalam | Koperasi Pekebun Kecil, / Majlis | Meor Syaharizan Meor Mohd Hariri | 179521 | 2011-02-09 00:00:00 | 2011-04-21 00:00:00 | 2011-02-22 00:00:00 |
Kawasan Majlis Daerah Lenggong, Perak - Cerun 3 | |||||||
(Design & Build) | Daerah Lenggong | Penolong Jurutera | |||||
64 | Kerja-Kerja Membaikpulih Dan Menstabilkan Cerun di | JKR Terengganu | Che Lah Bin Che Endut | 460350 | 2011-03-23 00:00:00 | 2011-05-02 00:00:00 | 2011-04-30 00:00:00 |
Jalan Bomba-Kg Paya Besar Serta Lain-Lain Kerja Yang | JD Hulu Terengganu | ||||||
Berkaitan Dengannya Di Kuala Berang, Daerah Hulu | |||||||
Terengganu. (Design & Build) | |||||||
65 | Proposed Slope Rehabilitation Works At KM 0.5, | Berjaya Hills Berhad | Mr. Chin Chean Fui | 230718 | 2011-04-18 00:00:00 | 2011-05-15 00:00:00 | 2011-05-12 00:00:00 |
Priority 'X', (Design & Build) | Project Director | ||||||
66 | Guniting Works at Horizon Towers, No. 1 Tanjung | Horizon Towers | Mr David Docker | 42600 | 2011-05-07 00:00:00 | 2011-05-23 00:00:00 | 2011-05-19 00:00:00 |
Bungah Park, 11200 Penang. (Design & Build) | Management Council | Project Manager | |||||
67 | Kerja-Kerja Kecemasan Membaikpulih Cerun | Perbadanan Bekalan | Ir. Ismail Hj Ishak | 357940.1 | 2011-05-11 00:00:00 | 2011-06-28 00:00:00 | 2011-06-27 00:00:00 |
Berdekatan Persiaran Taman Cantik, Bukit Bendera, | Air Pulau Pinang | Project Engineer | |||||
Pulau Pinang. (Design & Build) | Sdn Bhd | ||||||
68 | Kerja-Kerja Membaikpulih Cerun Di Kawasan Kompleks | Universiti | Ir.Mohd Nizam b. | 768000 | 2011-05-03 00:00:00 | 2011-09-02 00:00:00 | 2011-06-28 00:00:00 |
Desasiswa Restu, Saujana Dan Tekun (RST)- | Sains | Mohd Razak | |||||
(Slope 1, 2 & 3), Universiti Sains Malaysia,Pulau Pinang | Malaysia | Project Engineer' | |||||
(Design & Build) | |||||||
69 | Penstabilan Cerun Secara Reka dan Bina Di Sekolah | JKR Melaka | En Onni Dzasman | 2752132.3 | 2011-08-02 00:00:00 | 2012-02-27 00:00:00 | 2012-01-06 00:00:00 |
Menengah Arab Al -Asraf, Bukit Merchat, Daerah Alor | Nasruddin | ||||||
Gajah, Melaka (Design & Build) | Jurutera Daerah | ||||||
70 | Proposed Execution And Completion of Slope Protection | Setia Promenade | Ir. Tang Song Teik | 555439 | 2011-10-17 00:00:00 | 2012-01-16 00:00:00 | 2012-01-15 00:00:00 |
and Stabilization Works To 54 Units 3 Storey Semi- | Sdn Bhd | Project Manager | |||||
Detached (Phase 3C), On Part Of Lot 12025, Mukim 12, | Pulau Pinang | ||||||
D.B.D, Persiaran Kelicap, Pg (Design & Build) | |||||||
71 | Rock Slope Strengthening Works at Sector B: | Perdana Parkcity Sdn Bhd | Mr Khoo Wei Kiat | 920000 | 2011-12-05 00:00:00 | 4-Mac-12 | 2012-04-10 00:00:00 |
Zone B1 & Sector D: Zone D3 (Design & Build) | Project Manager | ||||||
72 | Kerja-Kerja Kecemasan Membaikpulih Cerun Runtuh | Lembaga Air Perak | Hj Idris Bin Hj Ibrahim | 305000 | 2012-01-09 00:00:00 | 2012-03-08 00:00:00 | 2012-02-22 00:00:00 |
Dan Kerja Berkaitan Di Loji Taiping Headworks, Taiping, | Ipoh, Perak | Jurutera Kanan | |||||
Perak - Cerun 3 (Design & Build) | |||||||
73 | Kerja-kerja Segera Membaikpulih Cerun Berdekatan | Perbadanan Bekalan Air Pulau Pinang Sdn Bhd | Ir. Ismail Hj Ishak | 197201.4 | 2012-03-19 00:00:00 | 2012-05-18 00:00:00 | 2012-04-26 00:00:00 |
Reservoir Cresent, Air Itam, Pulau Pinang | Jabatan Kejuruteraan | ||||||
(Design & Build) | Awam | ||||||
74 | Proposed Slope Mitigation Works At Taman Sri Bukit | Perbadanan Bekalan Air Pulau Pinang Sdn Bhd | Ir. Ismail Hj Ishak | 187380.2 | 2012-05-17 00:00:00 | 2012-07-16 00:00:00 | 2012-06-06 00:00:00 |
Indah, Bukit Mertajam, Pulau Pinang (Design & Build) | Jabatan Kejuruteraan | ||||||
Awam | |||||||
75 | Kerja-Kerja Segera Membaikpulih Cerun Di Jalan | Perbadanan Bekalan Air Pulau Pinang Sdn Bhd | Ir. Ismail Hj Ishak | 199753.3 | 2012-07-03 00:00:00 | 2012-09-02 00:00:00 | 2012-08-02 00:00:00 |
Menuju Air Itam, DAM, D.T.L, Pulau Pinang. | Jabatan Kejuruteraan | ||||||
(Design & Build) | Awam | ||||||
76 | Kerja-Kerja Kecemasan Membaikpulih Cerun Runtuh Di | Lembaga Air Perak | Hj Idris Bin Hj Ibrahim | 4918000 | 2012-04-24 00:00:00 | 2013-04-23 00:00:00 | 2012-11-23 00:00:00 |
Loji Rawatan Air Gerik V, Gerik, Perak Darul Ridzuan. | Ipoh, Perak | Jurutera Kanan | |||||
(Design & Build) | |||||||
77 | Cadangan Pembaikan Kegagalan Cerun Di Laluan | Jabatan Kerja Raya | Mohd Izainudin | 11100000 | 2012-07-15 00:00:00 | 2013-09-14 00:00:00 | 2013-07-03 00:00:00 |
FT185, Seksyen 65.1, Jalan Simpang Pulai/Lojing/ | Malaysia | Bin Ibrahim | |||||
Gua Musang, Kelantan (Design & Build) | Jurutera Jajahan | ||||||
78 | Projek Kerja-Kerja Pembaikan Cerun Sekolah | Kementerian | Ir. Hiew Vun Heng | 13370023.11 | 2012-12-03 00:00:00 | 2014-10-03 00:00:00 | 2014-10-03 00:00:00 |
Menengah Kebangsaan Sapulut, Nabawan, Sabah. | Pelajaran Malaysia | Koordinator Projek | |||||
(Pergerakan Cerun Baru Berdekatan Slope 1) | |||||||
(Design & Build) | |||||||
79 | Cadangan Kerja-Kerja Baik Pulih Cerun Runtuh Di | Jabatan Bekalan Air | Kholib Bin Hanafi | 1683858.38 | 2013-03-01 00:00:00 | 2014-05-02 00:00:00 | 2014-04-25 00:00:00 |
Tangki Air Bukit Besar, Wilayah Persekutuan Labuan | Project Manager | ||||||
(Design & Build) | |||||||
80 | Tender Design and Build Bagi Kerja-Kerja Kepakaran | Majlis Perbandaran | Mohd Mokhtar Bin Hj Mohd Murad | 286337 | 2013-07-04 00:00:00 | 2013-10-03 00:00:00 | 2013-09-13 00:00:00 |
Untuk Membaikpulih Cerun Menggunakan Kaedah | Pulau Pinang | ||||||
Soil Nailing' Dan 'Guniting', Untuk Kerja-Kerja | Jurutera Geoteknikal (1) | ||||||
Menstabilkan Tebing Cerun Di Belakang Rumah | |||||||
No. 410-I,410-J & 410-K, Lrg Taman Cantik 3, Seksyen 1, | |||||||
Bandar Air Itam, Pulau Pinang (Design & Build) | |||||||
81 | Tawaran Melaksanakan Kerja-kerja Pembaikan Cerun | Perniagaan Sinar | Khalid Bin Abd Rahman | 246446.6 | 2013-12-02 00:00:00 | 2014-02-11 00:00:00 | 2014-02-11 00:00:00 |
Runtuh Dan Kerja-Kerja Berkaitan Di K.M 2.1 | Juta / JKR Timur Laut | Project Manager | |||||
Bukit Bendera, Pulau Pinang (Design & Build) | |||||||
82 | Tawaran Melaksanakan Kerja-kerja Pembaikan Cerun | Sazrin Saidin/ | Sazrin Bin Saidin | 250446.6 | 2013-12-02 00:00:00 | 2014-02-11 00:00:00 | 2014-02-11 00:00:00 |
Runtuh Dan Kerja-Kerja Berkaitan Di K.M 4.0 | JKR Timur Laut | Project Manager | |||||
Bukit Bendera, Pulau Pinang (Design & Build) | |||||||
83 | Reka dan Bina Bagi Kerja-Kerja Menstabilkan Cerun | Frise Ace | Meor Syaharizan Meor Mohd Hariri | 362191.5 | 2014-07-14 00:00:00 | 2014-10-13 00:00:00 | 2014-09-03 00:00:00 |
Berhampiran Rumah No. 17 di Taman Bukit Senyum | Enterprise / | ||||||
(Slope 5), Lenggong, Perak | Majlis Daerah | Penolong Jurutera | |||||
(Design & Build) | Lenggong | ||||||
84 | Rundingan Terus Bagi Kerja-Kerja Segera Membaik- | USM | Zairil Azhar Zainol | 675000 | 2014-10-15 00:00:00 | 2015-01-14 00:00:00 | 2014-11-25 00:00:00 |
pulih Dan Menyenggara Cerun Di Kompleks Desasiswa | Jurutera Awam | ||||||
Restu, Saujana Dan Tekun (RST) Universiti Sains | |||||||
Malaysia, Pulau Pinang (Design & Build) | |||||||
85 | Kerja-kerja Pembaikan Saliran Utama Dari Stesen Atas | PDC/ Pembinaan | Mohd Yahaya Mohd Hassan | 213862 | 2014-11-03 00:00:00 | 2015-01-02 00:00:00 | 2014-12-12 00:00:00 |
Sehinga Stesen Viaduct, Bukit Bendera, Air Itam, DTL, | Ceria Sdn Bhd | ||||||
Pulau Pinang (Design & Build) | Pengurus | ||||||
86 | Tender Design And Build Bagi Kerja-Kerja Kepakaran | Majlis Perbandaran | Mohd Mokhtar Bin Hj Mohd Murad | 440299 | 2014-11-27 00:00:00 | 2015-02-26 00:00:00 | 2015-02-16 00:00:00 |
Untuk Membaikpulih Cerun Mengunakan Kaedah | Pulau Pinang | ||||||
Soil Nailing' Dan 'Guniting', Untuk Kerja-Kerja | Jurutera Geoteknikal (1) | ||||||
Menstabilkan Tebing Cerun Di Atas Tanah Majlis, | |||||||
Lot 3812, Mukim 18,Lorong Air Terjun, Daerah | |||||||
Timur Laut, Pulau Pinang (Design & Build) | |||||||
87 | Kerja Pemulihan Cerun Di Tapak Kolam Air Seri | Lembaga Air Perak | Hj Ishak B Abdul Rahman | 5727999.7 | 2014-12-31 00:00:00 | 2015-06-30 00:00:00 | 2015-06-15 00:00:00 |
Manjung Kampung Padang Pundut, Mukim Lumut, | Senior Engineer | ||||||
Daerah Manjung, Perak Darul Ridzuan | |||||||
(Design & Build) | |||||||
88 | Cadangan Pembaikan Cerun di Genting Highlands, | NCT Building & | Mr Ong Sea Jem | 4300000 | 2014-06-09 00:00:00 | 2015-09-08 00:00:00 | 2015-09-08 00:00:00 |
Pahang untuk Tetuan Galeri Tropika Sdn Bhd. | Civil Engineering | Project Manager | |||||
(Design & Build) | Sdn Bhd | ||||||
89 | Cadangan Kerja - Kerja Membaikpulih Struktur Tanah | Universiti Sains | Zairil Azhar Zainol | 142087 | 2015-10-19 00:00:00 | 2015-11-02 00:00:00 | 2015-10-23 00:00:00 |
Berhampiran Bangunan D04 & D05, Universiti | Malaysia | Jurutera Awam | |||||
Sains Malaysia, Kampus Induk, Pulau Pinang | |||||||
(Design & Build) | |||||||
90 | Turnkey Project - Kerja - Kerja Kecemasan Membaik- | Lembaga Air Perak | Kunasekaram A/L | 4000000 | 2015-11-18 00:00:00 | 2016-04-17 00:00:00 | 2016-03-21 00:00:00 |
pulih Cerun Runtuh Di Loji Rawatan Air Pulau Banding, | Suppiah Raman | ||||||
Gerik, Perak Darul Ridzuan (Design & Build) | Jurutera Operasi | ||||||
91 | Kerja Merekabentuk Dan Bina (Design & Build) | Universiti Sains | Zairil Azhar Zainol | 2094091.48 | 2016-03-30 00:00:00 | 2016-08-16 00:00:00 | 2016-05-27 00:00:00 |
membaikpulih Cerun Runtuh Bersebelahan Jalan Utama | Malaysia | Jurutera Awam | |||||
Hadapan Bangunan M07, Kompleks Desasiswa Restu, | |||||||
Saujana, Tekun (RST), Kampus Induk, Universiti Sains | |||||||
Malaysia, Pulau Pinang (Design & Build) | |||||||
92 | Cadangan Bagi Kerja-Kerja Pembaikan Tapak Asas | Teras Waja | Mohd Fauzi Hashim | 200000 | 2016-06-07 00:00:00 | 2016-07-05 00:00:00 | 2016-07-05 00:00:00 |
Konkrit Di PMU Kota Sarang Semut Dan Kerja-Kerja | Construction | Pengarah | |||||
Berkaitan Untuk Pejabat Peng. Negeri (Kedah & Perlis) | |||||||
(Design & Build) | |||||||
93 | Remaining Works To Soil Nailing And Rock Slope | Pantai Kok | Ir. Khoo Lai Peng | 2786997 | 2016-08-25 00:00:00 | 2016-12-24 00:00:00 | 2016-12-24 00:00:00 |
Strengthening Works For Main Road Realigment | Development | ||||||
Works To Proposed Resort Development At Lot PT374 | Sdn Bhd | ||||||
& 375, Mukim Padang Mat Sirat, Daerah Langkawi, | |||||||
Kedah Darul Aman | |||||||
94 | Cadangan Membina Dan Menyiapkan Kerja-Kerja | D'Utama | Noriza Binti Omar | 360200 | 2016-11-01 00:00:00 | 2017-01-15 00:00:00 | 2016-12-13 00:00:00 |
Penstabilan Cerun (Cerun Di Belakang Blok B) Projek | Development | Pengarah Urusan | |||||
Seri Bayu Fasa 2, Di Atas Lot 1032 - 1040, Jalan | Sdn Bhd | ||||||
Kampung Bukit, Mukim 11, Daerah Barat Daya, | |||||||
Bayan Lepas, Pulau Pinang | |||||||
95 | Tender Design and Build Bagi Kerja-Kerja Kepakaran | Majlis Bandaraya | Mohd Hanafi Bin Mohd | 230020 | 2016-12-19 00:00:00 | 2017-02-18 00:00:00 | 2017-02-14 00:00:00 |
Untuk Membaikpulih Cerun Menggunakan Kaedah | Pulau Pinang | Yaakob | |||||
Soil Nailing' Dan 'Guniting', Untuk Kerja-Kerja | Jurutera Geoteknikal (3) | ||||||
Menstabilkan Tebing Cerun Di Belakang Rumah | |||||||
No. 410-I,410-J Dan 410-K, Lorong Taman Cantik 3, | |||||||
Seksyen1, Bandar Air Itam, Pulau Pinang | |||||||
(Design & Build) | |||||||
96 | Slope Stabilisation & Slope Protection At Batu Ferringhi | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 1529246.5 | 2017-03-15 00:00:00 | 2017-11-14 00:00:00 | 2017-07-25 00:00:00 |
Aqueduct | Air Pulau Pinang | Ketua Jabatan | |||||
(Design & Build) | Pengeluaran | ||||||
97 | Kerja-Kerja Kecemasan Untuk Membaiki Cerun | Perbadanan Bukit | En. Muhammad Sahrizan | 147573.2 | 2017-03-20 00:00:00 | 2017-06-11 00:00:00 | 2017-04-27 00:00:00 |
Runtuh Di Kawasan 'J Plate 580' Landasan Sistem | Bendera Pulau | Sepiai | |||||
Funikular Bukit Bendera, Pulau Pinang (Mitigation | Pinang | Penolong Pengurus | |||||
Works ) (Design & Build) | |||||||
98 | Cadangan Merekabentuk, Membaiki, Menyiapkan | Pembinaan I & R | Ibrahim Hanafi | 2039600.65 | 2017-05-16 00:00:00 | 2018-01-15 00:00:00 | 2017-09-15 00:00:00 |
Cerun Di Fakulti Seni Lukis & Seni Reka (FSSR) Dan | Sdn Bhd | Pengarah Projek | |||||
Kerja - Kerja Berkaitan Di UiTM Shah Alam, Selangor | |||||||
(Design & Build) | |||||||
99 | Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 791220.2 | 2017-10-16 00:00:00 | 2017-12-15 00:00:00 | 2017-12-07 00:00:00 |
15 September 2017 - Kerja-Kerja Penstabilan Cerun | Air Pulau Pinang | Ketua Jabatan | |||||
Di 3 Lokasi Di Aquaduct, Batu Ferringhi | Pengeluaran | ||||||
(Design & Build) | |||||||
100 | Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 254370.6 | 2017-10-16 00:00:00 | 2017-12-15 00:00:00 | 2017-12-15 00:00:00 |
15 September 2017 - Kerja-Kerja Penstabilan Cerun | Air Pulau Pinang | Ketua Jabatan | |||||
Di 2 Lokasi Di Jalan Empangan Air Itam | Pengeluaran | ||||||
(Design & Build) | |||||||
101 | Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 531625 | 2017-10-24 00:00:00 | 2017-12-23 00:00:00 | 2017-12-23 00:00:00 |
19 September 2017 - Kerja-Kerja Penstabilan Cerun | Air Pulau Pinang | Ketua Jabatan | |||||
Di Kawasan Loji Rawatan Air Itam, Air Itam | Pengeluaran | ||||||
(Design & Build) | |||||||
102 | Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 594333.8 | 2017-10-24 00:00:00 | 2017-12-23 00:00:00 | 2017-12-23 00:00:00 |
29 September 2017 - Kerja-Kerja Penstabilan Cerun | Air Pulau Pinang | Ketua Jabatan | |||||
Di Cerun No.15A Dan Cerun 15B Di Aquaduct, | Pengeluaran | ||||||
Batu Ferringhi (Design & Build) | |||||||
103 | Kerja Segera Untuk Rawatan Dan Pembaikan Cerun | Jabatan Kerja Raya | En Samsulnizam Bin | 539016 | 2017-10-28 00:00:00 | 2018-01-27 00:00:00 | 2017-12-18 00:00:00 |
Dan Lain-Lain Kerja Berkaitan Di Antara 1.4KM - | Negeri Pulau Pinang | Zulkepli | |||||
1.5KM Jalan Tun Sardon, Daerah Barat Daya, | JKR Daerah Barat Daya | ||||||
Pulau Pinang (Design & Build) | |||||||
104 | Kerja Segera Untuk Pembersihan Sisa Runtuhan | Jabatan Kerja Raya | En Samsulnizam Bin | 345520 | 2017-11-08 00:00:00 | 2017-11-27 00:00:00 | 2017-11-13 00:00:00 |
Debris', Boulders, Pokok Tumbang Dan Kerja-Kerja | Negeri Pulau Pinang | Zulkepli | 0 | ||||
Berkaitan Untuk Runtuhan Cerun Di Jalan Tun Sardon, | JKR Daerah Barat Daya | ||||||
Daerah Barat Daya, Pulau Pinang (Design & Build) | |||||||
105 | Kerja-Kerja Kecemasan Penstabilan Cerun Di Tangki | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 914821 | 2017-12-11 00:00:00 | 2018-04-10 00:00:00 | 2018-01-23 00:00:00 |
Air Taman Tanah Aman, Bukit Mertajam, Seberang | Air Pulau Pinang | Ketua Jabatan | |||||
Perai Tengah Akibat Kejadian Tanah Runtuh Pada | Pengeluaran | ||||||
05 November 2017 (Design & Build) | |||||||
106 | Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 199981.9 | 2017-12-14 00:00:00 | 2018-02-13 00:00:00 | 2018-01-18 00:00:00 |
15hb September 2017 - Kerja-Kerja Pengukuhan | Air Pulau Pinang | Ketua Jabatan | |||||
Cerun Di Cerun No. 5A(KM0.8) Jalan Empangan Air | Pengeluaran | ||||||
Itam (Design & Build) | |||||||
107 | No. Rundingan : - Perolehan Untuk Kerja-Kerja Baik- | Universiti Sains | Zairil Azhar Zainol | 1058940 | 2017-11-14 00:00:00 | 2018-03-31 00:00:00 | 2018-02-14 00:00:00 |
pulih Hakisan Cerun Di Kawasan Bukit, Bersebelahan | Malaysia | Jurutera Awam | |||||
Jalan Utama Bertentangan Bangunan M01, Kompleks | |||||||
Desasiswa Restu, Saujana Dan Tekun, Universiti Sains | |||||||
Malaysia, Pulau Pinang (Design & Build) | |||||||
108 | Kerja-Kerja Pembersihan di Middle Station, | Perbadanan Bukit | En. Muhammad Sahrizan | 70000 | 2017-11-27 00:00:00 | 2017-11-29 00:00:00 | 2017-11-29 00:00:00 |
Pulau Pinang | Bendera Pulau | Sepiai | |||||
Pinang | Penolong Pengurus | ||||||
109 | Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 450614.4 | 2017-12-11 00:00:00 | 2018-03-10 00:00:00 | 2018-03-10 00:00:00 |
5hb November 2017 - Kerja-Kerja Pengukuhan | Air Pulau Pinang | Ketua Jabatan | |||||
Cerun Di Cerun No. 17,18 & 19, Aquaduct Batu | Pengeluaran | ||||||
Ferringhi (Design & Build) | |||||||
110 | Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 572421.4 | 2017-11-21 00:00:00 | 2018-03-20 00:00:00 | 2018-03-20 00:00:00 |
5hb November 2017 - Kerja-Kerja Pengukuhan | Air Pulau Pinang | Ketua Jabatan | |||||
Cerun Di Cerun No. 13, Aquaduct Batu Ferringhi | Pengeluaran | ||||||
(Design & Build) | |||||||
111 | Kerja-Kerja Kecemasan Penstabilan Cerun Di KM 0.6 | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 219796.4 | 2018-02-21 00:00:00 | 2019-02-20 00:00:00 | 2018-03-31 00:00:00 |
Jalan Empangan Air Itam (Slope No.5) | Air Pulau Pinang | Ketua Jabatan | |||||
(Design & Build) | Pengeluaran | ||||||
112 | Kerja -Kerja Kecemasan Penyiasatan Tapak, Analisa, | Perbadanan Bekalan | Pn. Mariam Abdul Kadir | 591484.1 | 2018-06-29 00:00:00 | 2018-08-28 00:00:00 | 2018-08-06 00:00:00 |
Rekabentuk Dan Melaksanakan Kerja-Kerja Kawalan | Air Pulau Pinang | Ketua Jabatan | |||||
Hakisan Dan Mendapan Di Lot 218, Mukim 18, DTL, | Pengeluaran | ||||||
Sungai Kelian, Tanjung Bungah, Pulau Pinang | |||||||
(Design & Build) | |||||||
113 | Design And Construct Slope Stabilisation On 3 Slopes | Perbadanan Bekalan | Yeap Cheng Soon | 1521151.9 | 2018-07-23 00:00:00 | 2018-11-22 00:00:00 | 2018-11-07 00:00:00 |
At Air Itam Dam (Slope No 6, 9 & 17) (Design & Build) | Air Pulau Pinang | Pen. Pengurus | |||||
Jab. Pengeluaran | |||||||
114 | Cadangan Merekabentuk, Membina Dan Kerja-Kerja | Perniagaan Masoha | Md Kasim Bin Hanafi | 759888.53 | 2018-07-23 00:00:00 | 2018-11-22 00:00:00 | 2018-11-07 00:00:00 |
Perlindungan Cerun Di Jalan Air Itam | Pengurus | ||||||
115 | Tawaran Bagi Kerja-Kerja Penstabilan Cerun Di | Perbadanan Bukit | En. Muhammad Sahrizan | 2738122 | 2018-09-12 00:00:00 | 2019-03-11 00:00:00 | 2019-02-12 00:00:00 |
Kawasan Downslope Bangunan Masjid, Kuil Dan Banglo | Bendera Pulau | Sepiai | |||||
Bel Retiro Di Atas Bukit Bendera, Daerah Timur Laut, | Pinang | Penolong Pengurus | |||||
Pulau Pinang (Design & Build) | |||||||
116 | Emergency Work To Construct Erosion And Siltation | Perbadanan Bukit | En. Muhammad Sahrizan | 144992.1 | 2018-10-29 00:00:00 | 2018-12-28 00:00:00 | 2018-11-09 00:00:00 |
Control On Additional Landslide On Lot 218, DTL | Bendera Pulau | Sepiai | |||||
Sg Kelian, Tanjung Bungah. (Design & Build) | Pinang | Penolong Pengurus | |||||
117 | Emergency Work To Design And Repair Erosion On | Perbadanan Bekalan | Yeap Cheng Soon | 1602583.2 | 2019-03-28 00:00:00 | 2019-09-27 00:00:00 | 2019-05-13 00:00:00 |
Left Landslide Abutment At Air Itam Dam | Air Pulau Pinang | Pen. Pengurus | |||||
(Design & Build) | Jab. Pengeluaran | ||||||
118 | Project Turnkey : Kerja-Kerja Kecemasan Penstabilan | Lembaga Air Perak | Kunasakaram A/L Suppiah | 460000 | 2019-08-01 00:00:00 | 2019-11-01 00:00:00 | 2019-08-05 00:00:00 |
Dan Mitigasi Cerun Di Trong, Taiping, Perak Darul | Raman | ||||||
Ridzuan (Design & Build) | Penolong Jurutera | ||||||
119 | Kerja-Kerja Pentabilan Cerun Di Kawasan Upslope | Perbadanan Bukit | En. Muhammad Sahrizan | 7450781.5 | 2019-08-01 00:00:00 | 2020-08-01 00:00:00 | 2020-03-18 00:00:00 |
Dan Downslope Jalan Viaduct West, Bukit Bendera | |||||||
Daerah Timur Laut, Pulau Pinang | Bendera Pulau | Sepiai | |||||
(Design & Build) | Pinang | Penolong Pengurus | |||||
120 | Slope Stabilisation Works At Guillemard Water | Pembinaan I & R/ | Kholib Bin Hanafi | 2018493 | 2019-10-07 00:00:00 | 2020-04-06 00:00:00 | 2020-02-21 00:00:00 |
Treatment Plant | Perbadanan Bekalan | Pengurus Projek | |||||
Air Pulau Pinang | |||||||
121 | Emergency Work To Clear Silt In The Check Dams | Perbadanan Bekalan | Yeap Cheng Soon | 26669 | 2020-05-05 00:00:00 | 2020-05-21 00:00:00 | 2020-05-21 00:00:00 |
Along Sungai Kelian at Guillemard Water Treatment | Air Pulau Pinang | Pen. Pengurus | |||||
Plant | Jab. Pengeluaran | ||||||
TOTAL | 146078649.18 |